![stupp Stupp Bros. Bridge & Iron](https://pecinc.org/wp-content/uploads/2015/04/stupp.jpg)
Projects Details
Heavy Pre-Engineered Steel
Total building 3,100 ft. long with 3,100 ton cranes running each section
40-50 ft. eave heights
3,000 tons of steel
Total Square Feet:395,000
Heavy Pre-Engineered Steel
Total building 3,100 ft. long with 3,100 ton cranes running each section
40-50 ft. eave heights
3,000 tons of steel
Total Square Feet:395,000